2025-11-20 Deputation Ordinary Meeting

Randal Delaney, Peregian Beach Residents Against Active Streets

Peregian Beach Active Street

Heard at the meeting. Council's recording has this deputation from 9:49; our transcript is below.

▶ Hear it — council's recording, from 9:49
The feed timestamps the whole deputation block rather than each speaker, so this starts at the top of that block.

What the minutes record

Applicant Randal Delaney, Peregian Beach Residents Against Active Streets

Topic Peregian Beach Active Street

Speakers Randal Delaney

That is all the minutes say. Council does not minute what a deputation says — not a summary, not a topic sentence. Across every deputation in council's published meeting feed, the minuted discussion field is empty. The agenda names the speaker and the subject, and the rest exists only in the recording, linked above.

Transcript of the recording

What this is. Transcript of council's recording, produced by automatic speech recognition and not checked line by line against the video. Names and figures are where this kind of transcript fails first. It is our transcript, not council's record. Recording © Noosa Shire Council. Council's own recording is linked above; where the two differ, the recording governs.

9:49 Mayor Wilkie: The next speaker is Randall Delaney and the topic is the Frisian Beach Active Street. Mr Delaney, the microphone is yours.

10:01 Can you hear me?

10:05 Speaker 3: I hope I get through this in time. While residents are generally supported by the Noosa Council's broad goal of enhancing walking and cycling infrastructure, and the specific approach adopted in the Frisian Beach Active Street initiative has provoked strong and widespread opposition. Many in the community, myself included, are particularly troubled by the plan to establish a recreational cycling route made of four interconnecting active streets traversing a quiet residential neighbourhood on the way to the village. The proposal directly contradicts the preferences of most local residents who have consistently raised concerns and expressed their objections to the concept. The depth of feeling against the initiative highlights the disconnect between council's current plans and the wishes of residents. The handling of the Frisian Beach Active Street initiative has resulted in considerable time in community confidence and trust towards council. Many residents perceived that the project as poorly planned, overly radical, largely unwanted and failing to meet community needs. This widespread view has intensified due to council's misrepresentation of the extent and nature of local backing for the initiative. Members of the community feel council has failed to engage in genuine consultation with local council.

11:24 There has been little efforts made to involve or listen to those that would be most affected. The lack of processes fuelled further dissatisfaction and reinforcing disconnect between council's actions and the community expectations. Residents have not received clear, impartial or thorough information from council regarding the actual impacts that these projects may have on their local community. From the outset, council has treated the initiative as a beneficial idea and has subsequently sought to justify its implementation. Even though the proposal does not align with or address the needs of the community or suit this particular residential scenario. Despite numerous inquiries and requests for further details from residents, significant concerns and issues remain unresolved in council communications. Major topics raised by the community have either gone unanswered or have not been meaningfully addressed. Despite council's claims that the Frisian Beach Active Street project is a good idea, council claims that the Frisian Beach Active Street project does not align with the priorities that residents expressed during the 2021 Walking and Cycling Strategy Consultation. Feedback from the community highlighted a clear desire for the development of additional off-road pathways and bikeways.

12:41 Enhanced connectivity between residential neighbourhoods and key local amenities. Enhanced connectivity between and facilitates safe crossings and improved crossings across major roads. Enhanced connectivity between residential neighbourhoods and key local amenities. In addition to the council's desire for a safer recreational parkways, the focus was on the projects that will benefit access to activity centres, schools and recreational facilities. Further, council's own transport strategy reinforced the need for safe road crossings and prioritised encouraging walking and cycling as a preferred daily transport option. The current proposal however does not deliver on these expectations, particularly with respect to overall connectivity. There is a lack of adequate safe crossing opportunities on major roads such as David Loway and E.U. Mountain Road, together with a noticeable absence of interconnected off-road shared pathways within the precinct. As a result, these recreational-focused projects are unlikely to encourage walking and cycling as practical choices for everyday transport. Additionally, the initiative fails to address challenges linked to increased visitation in the foreshore areas and does not provide solutions for reducing traffic, congestion and parking issues or vehicle emissions along the residential streets within the village centre or David Loway. The proposed design will channel more cyclists and pedestrians into neighbourhood streets that are already experiencing increased traffic volumes and visitor pressures. This means genuine cycling safety concerns will remain unresolved as the use of the on-road cycle zones exposes a growing number of cyclists to direct conflict without any physical separation. Moreover, the proposal does not account for the risks associated with unlicensed reckless e-bike riders, nor the behaviour of a number of cyclists who spin, cut corners and fail to yield as required by law. Introducing higher volumes of visitor cyclists and fast-selling e-bikes into essentially residential streets will significantly increase the risks for all road users.

14:57 Council maintain that the Active Street design is practical, evidence-based and specifically adapted for Noosans' unique environment. However, the assertion rests mainly on an internal literary review of planning materials, which provides neither substantial or independent evidence. To date, Council has not referenced any comparable Active Street project in any city within Australia or elsewhere that mirrors the multi-street approach planned for Peregian Beach. This addition raises significant doubts about the suitability and effectiveness of the proposed solution in the local context. One councillor argued that if similar systems are successful in establishing cycling in cities in Europe, then the same model will succeed in Peregian Beach. This stance is both unfounded and an axiological basis for drawing such a direct comparison between a dissimilar context. Further, Council has not offered a clear, credible justification for the introduction of on-road priority cycle zones, especially as existing infrastructure such as wide cycle lanes along Babelway already accommodate cycling. Local streets in Peregian Beach have long operated effectively as shared spaces already, without any dedicated footpaths. Additionally, with proposals to implement the new 1.5-metre off-road shared parkways, the need for an active street design remains unsubstantiated. Granting cyclists and mid-bikes riders preferential access to residential streets undermines the rights and safety of residents, without delivering clear and measurable benefits to the community. Instead, Council continues to promote unverified advantages, while minimising and ignoring the negative impacts on local amenity and safety which have been consistently raised in the Community Council's submissions to Council. Another significant concern pertains to Council's exclusion of any mention of active streets in its current five and ten-year implementation plans. The Community has yet to receive a comprehensive explanation regarding the criteria by which these projects were prioritised over other, potentially more deserving, issues identified within Council's own project prioritisation documents. This lack of transparency diminishes public confidence in the decision-making processes and raises legitimate questions about the rationale for this project selection.

17:17 Despite repeated calls from residents, Council has not provided an adequate explanation for the decision to reject the off-road shared pathway within the road reserve west side of Davidlow Way. Community members argued that this alternative is not only safer and more straightforward, but could be a more cost-effective solution and could be better suited for preserving local amenity. The kilometres of shared pathway along Davidlow Way on the west side in Coorong are already falling part of the coastal pathway. This sets a strong precedent for seriously considering this option. Additionally, developing a dedicated pathway along the edge of the National Park would help to maintain a fire buffer for the residential prisons, offer a more scenic route and provide the opportunity to create shaded rest points entirely free from driveways and motor vehicle conflicts. These recreational and tourist benefits are not achievable through the Loretty Drive alignment. Even the Pritchin Beach Community Association has refrained from endorsing the extension of the pilot to additional streets, instead urging Council to give consideration to the use of the western road reserve along Davidlow Way. Council's claim that the preferred route was chosen following consultation of the 2020 consultation pathway corollary study is insufficient.

18:42 Particularly as these findings from this study have not been made available to the public or subject to an independent review. The assertion that these factors such as safety, connectivity, comfort and feasibility guided the selection process lacks credibility, given the absence of a thorough feasibility assessment and cost benefit analysis specific to the Pritchin Beach scenario. Council has misrepresented the actual level of local community support for the active streets, despite the submission of the formal petition with signatures from the local community.

19:19 Council appears to have placed considerable weight on the recommendations and support from special interest groups such as those involving tourism, events, cycling and associated business. There are concerns regarding whether the guidance from these financially invested and non-local groups can truthfully represent or prioritise the needs of the Pritchin Beach community. Justification for both the chosen route and the implementation of cycle zones lacks transparency and detail. No additional solutions have ever been presented to the community. Additionally, the grant application that has secured the $1.6 million in state funding for the pilot project remains inaccessible for review. The lack of transparency leaves residents in a position of having to trust council decisions without critical information. Many community members are now only becoming aware and understanding the impacts these projects will have on their streets. It is important to note that this is not the first time that these projects have been Even the most recent Digital Doorknock news update, which was intended to address previous complaints about inadequate communication, was vague and failed to provide the necessary detail. The ongoing lack of clarity and authentic engagement rages serious concerns about whether council has learned from experiences such as the criticisms levelled at the Noosa Corshaw Master Plan for its over-designed and insufficient consultation.

20:43 Council has neglected to follow Tewantin principles and its own established design values. These principles call for considering the broader context, avoiding isolated project views, accounting for the effects of design decisions, respecting the unique character of towns and villages, and creating a transport network that integrates with rather than overwhelms the environment. Despite these values, council has not developed a comprehensive or holistic walking and cycling master plan for the Peregian Beach Precinct. Even the PDCA has not developed a comprehensive or holistic walking and cycling master plan for detailed design from Jabiru Street to Sestrania Drive and for meaningful consultation with the community before any further action is taken. Many residents in Peregian Beach have expressed strong opposition to the prospect of living on a coastal recreational pathway. A source of concern is the expected increase in cycle traffic through residential streets, a situation that is likely to be made worse by ongoing development and population growth south of our border, and increased tourism ahead of the 2032 Olympics. These changes are anticipated to add pressure on local streets, intensifying existing infrastructure and concerns within the community. The community is united in its preference for safe streets, not overactive streets. Residents overwhelmingly support the use of off-road shared pathways instead of on-road cycle zones.

22:01 Residents favour recreational pathways routed through scenic bushland rather than residential areas. Viable alternatives to council's current plan exist and would ease, rather than increase, the pressure on local streets. Some residents have already put forward alternative ideas, demonstrating the community is actively discussing solutions tailored to local needs. Residents believe the effective consultation would enable council to identify and implement these locally-informed alternatives. Consequently, residents are calling on council to halt both the current pilot and any future planning of active streets in the area. We urge council to engage in genuine consultation with all directly affected residents, and ensure that the current plans and route routes are as effective as possible. We urge council to engage in joint efforts to ensure that the new designs are informed and guided by community feedback. Thank you.

22:46 Mayor Wilkie: Thank you, Mr. Kiliany.