Noosa Council Watch

An independent, unofficial record of Noosa Shire Council — what council decided, what they closed the doors on, and why it matters. About this site

Noosa Council meetings since 2014: papers, decisions and recordings, and from April 2023 the video cued to each item.

General Committee Meeting - 16 November 2020

Monday 16 November 2020 · General Committee Meeting · 11 decisions minuted

This meeting predates council's current meetings system, which begins in April 2023, so there is no agenda here with each item cued to the video. What follows is what the record holds: council's papers, the recording, and the decisions its minutes record.

Papers

Council keeps papers from before April 2023 on a separate archive page for each year, listed by meeting date. The files stay on council's site — why.

Recording

Decisions

Every decision the minutes record, in the order minuted. Where a division was called the names are on the contested votes register; otherwise the minutes say only whether it carried.

  1. Confirmation of Minutes
  2. The Minutes of the General Committee Meeting held on 12 October 2020 be received and confirmed. committee resolution Carried unanimously

    The Minutes of the General Committee Meeting held on 12 October 2020 be received and confirmed.

    Moved by Karen Finzel, seconded by Clare Stewart.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  3. 132008.1128.04 Request to Change an Existing Approval for
  4. That Council note the report by the Coordinator Planning to the Planning & Environment Committee Meeting dated 10 November 2020 regarding Application No. 132008… committee recommendation Carried unanimously

    That Council note the report by the Coordinator Planning to the Planning & Environment Committee Meeting dated 10 November 2020 regarding Application No. 132008.1128.04 to make a minor change to an existing approval for Development Permit for Material Change of Use for Multiple Housing – Type 3 Retirement & Special Needs; Commercial Business – Type 2 Medical and Development Permit for Reconfiguring a Lot (1 into 2 lots) situated at Grasstree Court, Sunrise Beach and: A. Approve the change. B. Amend conditions 1, 5, 7, 12, 14, 23, 33, 35, 40, 41 and 81 to read as follows: PLANNING General 1. The development must be undertaken in accordance with this approval and must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan Name Date 7448-06 Lots 1 & 9 Cancelling Lot 1 on 15 May 2008 SP177650 Prepared by Conics (Sunshine Coast) Pty Ltd DA_106 3 Masterplan prepared by Thomson 15 October 2020 Adsett Architects DA_107 4 Staging Plan prepared by Thomson 15 October 2020 Adsett Architects DA_108 3 Precincts Plan prepared by Thomson 15 October 2020 Adsett Architects DA_109 3 Pedestrian Circulation prepared by 15 October 2020 Thomson Adsett Architects DA_110 3 Vehicular Circulation prepared by 15 October 2020 Thomson Adsett Architects DA_111 3 Building Setbacks prepared by 15 October 2020 Thomson Adsett Architects DA_112 3 Landscaping Calculation prepared by 15 October 2020 Thomson Adsett Architects DA_113 3 Site Cover Calculations prepared by 15 October 2020 Thomson Adsett Architects DA_114 3 Masterplan/Parking Layout prepared by 15 October 2020 Thomson Adsett Architects DA_115 Typical Site Section A prepared by November 2018 Smith + Tracey Architects DA_116 External Finishes Schedule prepared November 2018 by Smith + Tracey Architects DA_117 2 Area Schedules prepared by Thomson 15 October 2020 Adsett Architects DA_118 6 Residential Aged Care – Ground Floor 15 October 2020 Plan prepared by Thomson Adsett Architects DA_119 5 Residential Aged Care – First Floor 15 October 2020 Plan prepared by Thomson Adsett Architects DA_120 4 Residential Aged Care – Roof Plan 15 October 2020 prepared by Thomson Adsett Architects DA_121 3 Residential Aged Care – N and W 15 October 2020 Elevations prepared by Thomson Adsett Architects DA_122 4 Residential Aged Care – S and E 15 October 2020 Elevations prepared by Thomson Adsett Architects DA_123 3 Residential Aged Care – Typical 15 October 2020 Sections prepared by Thomson Adsett Architects DA_124 Residential Aged Care – Village Site November 2018 Plan prepared by Smith + Tracey Architects DA_125 Central Facilities & ILAs – Basement November 2018 Car Park prepared by Smith + Tracey Architects DA_126 Central Facilities & ILAs – Ground Floor November 2018 Plan prepared by Smith + Tracey Architects DA_127 Central Facilities & ILAs – Level 1 First November 2018 Floor Plan prepared by Smith + Tracey Architects DA_128 Independent Living Apartment Type a1- November 2018 2b (& handed) prepared by Smith + Tracey Architects DA_130 Central Facilities & ILAS – S & W November 2018 elevations DA_131 Central Facilities & ILAs – E Elevation November 2018 and Typical Section prepared by Smith + Tracey Architects DA_132 Central Facilities & ILAs – N Elevation November 2018 & Typical Section prepared by Smith + Tracey Architects DA_133 Apartment Buildings – Basement Plan November 2018 prepared by Smith + Tracey Architects DA_134 Apartment Buildings – Ground Floor November 2018 Plan prepared by Smith + Tracey Architects DA_135 Apartment Buildings – First Floor Plan November 2018 prepared by Smith + Tracey Architects DA_136 Apartment Type a2-2b & type a3-3b November 2018 prepared by Smith + Tracey Architects DA_137 Apartment Buildings – E & W November 2018 Elevations prepared by Smith + Tracey Architects DA_138 Apartment Buildings – Typical N November 2018 Elevation & Section prepared by Smith + Tracey Architects DA_139 Apartment Building 4 / Roof Plan November 2018 prepared by Smith + Tracey Architects DA_1340 Apartment Building 4 / Sections November 2018 prepared by Smith + Tracey Architects DA_141 Apartment Building 3 / Roof Plan November 2018 prepared by Smith + Tracey Architects DA_142 Apartment Building 3 / Sections November 2018 prepared by Smith + Tracey Architects DA_143 Apartment Building 2 / Roof Plan November 2018 prepared by Smith + Tracey Architects DA_144 Apartment Building 2 / Sections November 2018 prepared by Smith + Tracey Architects DA_145 Apartment Building 1 / Roof Plan November 2018 prepared by Smith + Tracey Architects DA_146 Apartment Building 1 / Sections November 2018 prepared by Smith + Tracey Architects DA_147 Apartment Buildings – Photo Montage November 2018 from National Park prepared by Smith + Tracey Architects DA_148 ILU Type C (2B-1G) prepared by Smith November 2018 + Tracey Architects DA_149 ILU Type C (3B-2G) prepared by Smith November 2018 + Tracey Architects DA_150 ILU Type D (3B-2G) prepared by Smith November 2018 + Tracey Architects DA_151 ILU Type H1 (2B-1G) + K1 (3B-2G) November 2018 prepared by Smith + Tracey Architects DA_152 ILU Type H2 (2B-1G) + H2 (3B-2G) November 2018 prepared by Smith + Tracey Architects DA_153 Independent Living Units – Roof Plans November 2018 prepared by Smith + Tracey Architects DA_154 Independent Living Units – Elevation November 2018 Sheet 1 prepared by Smith + Tracey Architects DA_155 Independent Living Units – Elevation November 2018 Sheet 2 prepared by Smith + Tracey Architects DA_156 Independent Living Units – Typical November 2018 Sections prepared by Smith + Tracey Architects Nature and Extent of Approved Use 5. The approved development comprises the following:  Multiple Housing – Type 3 Retirement & Special Needs (122 independent living units and apartments and 102 aged care beds)  Commercial Business – Type 2 Medical (as indicated on approved plans) Staging 7. The development must be staged in accordance with the plan titled ‘Masterplan’ prepared by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3 with the Residential Aged Care Facility provided in the first stage. LANDSCAPE & ECOLOGY Flora 12. In conjunction with an application for operational works on the site for the first stage, the applicant must submit an operational works application for Vegetation Management for the development site. The Vegetation Management operational works application must detail: 12.1 Identification of all active Glossy Black Cockatoo food trees within the development footprint or in areas likely to be impacted upon by the operation or construction of the development. 12.2 A Vegetation Clearing Offset program to be undertaken to re- establish the habitat to be cleared from the site to a nearby location with similar soil properties. A receiving site is to be identified and maintained for a specified period (minimum 5 years) after the establishment of the receiving site. 12.3 The Vegetation Clearing Offset program must include the details of the transfer methods to be engaged including: 12.3.1 The transfer of soil/seed bank media off the site to the designated receiving site(s); 12.3.2 Methods of transfer including, inter alia, mastication of native vegetative matter, tile transfer of live soil/plant matrix, peat locations and extents, sexual and vegetative methods of revegetation of offset receiving site and other deemed pertinent matters by a person with industry experience in the successful establishment and/or re-establishment of heathland vegetation; 12.3.3 Transfer of rare and threatened plant species (sexual and/or vegetative); 12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank media off the site and methods of transplanting; 12.3.5 Details of seed collections times and estimated establishment procedures and times;

    Moved by Amelia Lorentson, seconded by Clare Stewart.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  5. MCU19/0134 Planning & Environment Court Appeal No. D67 of 2020 - Refusal of an Application for a Bar at 5 Taylor Court, Cooroy
  6. That Council note the report by the Manager Development Assessment to the Planning & Environment Committee Meeting dated 10 November 2020 and: A. aAgree to se… committee recommendation Court cases Development Carried unanimously

    That Council note the report by the Manager Development Assessment to the Planning & Environment Committee Meeting dated 10 November 2020 and: A. aAgree to settle the Planning & Environment Court aAppeal No. D67 of 2020 generally in accordance with the following conditions: When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date RL 18003 - Titled "Ground Furniture and Equipment 5 Dec 2019 Sheet 1 of 2 Layout, Ground Floor Areas – Proposed Industrial fitout", drawn by Rhad Leonard RL 18003 - Titled "Mezzanine Furniture and Equipment 5 Dec 2019 Sheet 2 of 2 Layout, Mezzanine Area – Proposed Industrial fitout", drawn by Rhad Leonard Nature and Extent of Approved Use 3. The Entertainment & Dining Business – Type 3 Bar must operate all times in association with the Distillery use within Tenancies 1 and 11. If the associated Distillery use ceases, then the Entertainment & Dining Business – Type 3 Bar must cease. 4. The patron use area for the consumption of food, drink and alcohol and/or congregation is limited to within the 21m² ground floor seating area identified in green on Drawing RL18003, sheet 1 of 2, drawn by Rhad Leonard, dated 5 December 2019 with a maximum of 20 chairs. 5. The 21m² seating area is only permitted to be used by patrons who have booked via a tour either directly through the Distillery or one of the affiliated tour companies or have booked a time slot for a table booking, these will be limited to 2 hours. 6. The 21m² ground floor area identified in green on Drawing RL18003, sheet 1 of 2, drawn by Rhad Leonard, dated 5 December 2019 must be clearly marked by way of floor marking, pedestrian barriers, posts or similar. 7. The Tenancy 1 mezzanine area identified on Drawing RL18003, sheet 2 of 2, titled "Mezzanine Furniture and Equipment Layout, Mezzanine Area – Proposed Industrial fitout", drawn by Rhad Leonard, dated 5 December 2019 must not be used by patrons for the consumption of food, drink and alcohol and/or congregation. 8. Patrons are permitted to be taken on a short tour of the associated Distillery use within Tenancies 1 and 11 (including the Tenancy 1 mezzanine area). 9. The approved use must not operate outside the hours of Friday, 3:00pm to 8:00pm and week-ends and public holidays 12:00pm – 8:00pm. 10. The sale and/or consumption of alcoholic products is limited to those alcoholic products produced by the associated Distillery use. Any alcoholic beverages that are not produced as part of the Distillery use on the site must not be sold from the site. 11. No televisions displaying sports, music videos, news or the like are permitted to be operated. Television monitors are only permitted to display the menu board for the Entertainment and Dining Business Type 3 Bar use. 12. Only finger type food is permitted to be sold and/or consumed. Lighting of External Areas 13. During operating hours, all parking areas, pedestrian areas and entrances/exits must be well lit with vandal resistant lighting and with intensities to satisfy the requirements of Australian Standard AS1158 “Public Lighting Code”. Lighting must be designed to reduce the contrast between shadows and well lit areas. Noise Management 14. Noise from the Entertainment & Dining Business – Type 3 Bar, including amplified or non-amplified noise and patron noise must not exceed: Continuous Noise  daytime (0700 to 1800 hours): 41.9 + 0 = 42 dB(A) LA10,adj,T;  evening (1800 to 2200 hours): 46.6 + 0 = 47 dB(A) LA10,adj,T Time Varying Noise  daytime (0700 to 1800 hours): 41.9 + 5 = 47 dB(A) LA10,adj,T;  evening (1800 to 2200 hours): 46.6 + 5 = 52 dB(A) LA10,adj,T Courtesy Bus 15. A free-on-call courtesy bus must be available at all times during operating hours and available for patrons within a 15 minute driving radius of the site. 16. The courtesy bus is not permitted to remain on site outside of the hours of operation. Staff Numbers 17. A maximum of 3 staff (including 1 dedicated courtesy bus driver) and 1 manager for the Entertainment and Dining Business Type 3 Bar use are to be on site at any one time. Currency Period 18. The Currency Period for this development approval lapses if the use has not happened by 19 November 2026, unless an application to extend the currency period is approved by Council. B. Include the following advisory note on the development approval: 1. The proposed bar is located in an area that is zoned Low Impact Industry under the Noosa Plan 2020 and a range of industrial uses are planned to establish that may generate noise, odour, dust, waste nuisance or the like. These industrial businesses will not be required to include additional measures to address the potential impacts from these industrial uses on the bar given that they should reasonably be expected.

    Moved by Brian Stockwell, seconded by Joe Jurisevic.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  7. Local Government Governance Reform
  8. That Council note the report by the Chief Executive Officer to the Services & Organisation Committee Meeting dated 10 November 2020 regarding local government g… committee recommendation Carried unanimously

    That Council note the report by the Chief Executive Officer to the Services & Organisation Committee Meeting dated 10 November 2020 regarding local government governance reform and: A. Adopt the updated Councillor Code of Conduct (prescribed by the Department of Local Government, Racing and Multicultural Affairs) dated 4 August 2020 provided at Attachment 1 to the report and repeal the previous Councillor Code of Conduct which was adopted by Council in December 2018 and further, agree that each Councillor will sign a declaration to abide by the new Councillor Code of Conduct at all times; B. Adopt the updated Standing Orders for Council Meetings provided at Attachment 2 to the report and repeal the previous Standing Orders which were adopted in by Council in August 2019; C. Repeal the Model Meeting Procedures adopted by Council on 20 December 2018 and note that the new Model Meeting Procedures provided at Attachment 3 to the report have been incorporated into Council’s Standing Orders for Council Meetings; D. Adopt the updated Investigation Policy provided at Attachment 4 to the report and repeal the previous Investigation Policy which was adopted by Council in December 2018; and E. Adopt the Councillor Briefing Sessions and Workshops (Non-Statutory Meetings) Policy provided at Attachment 5 to the report.

    Moved by Joe Jurisevic, seconded by Frank Wilkie.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  9. Infrastructure Services Department Update – 1ST Quarter 2020-21
  10. That Council note the declarable conflict of interest by Cr Wegener and determine that it is in the public interest that Cr Wegener participates and votes on th… committee resolution Carried unanimously

    That Council note the declarable conflict of interest by Cr Wegener and determine that it is in the public interest that Cr Wegener participates and votes on this matter because Council believes that Cr Wegener does not have a close personal relationship with Mr St Baker and therefore a reasonable person would trust that the final decision is made in the public interest.

    Moved by Joe Jurisevic, seconded by Clare Stewart.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  11. That Council note the report by the Director Infrastructure Services to the Services & Organisation Committee Meeting dated 10 November 2020 providing an update… committee recommendation Carried unanimously

    That Council note the report by the Director Infrastructure Services to the Services & Organisation Committee Meeting dated 10 November 2020 providing an update on operations of the Infrastructure Services Department for the period 1 July to 30 September 2020.

    Moved by Joe Jurisevic, seconded by Clare Stewart.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  12. Noosa Council 2019-20 Annual Report
  13. That Council note the report by the Director Executive Services to the General Committee Meeting dated 16 November 2020 and: A. Adopt the Noosa Council 2019-… committee recommendation Carried unanimously

    That Council note the report by the Director Executive Services to the General Committee Meeting dated 16 November 2020 and: A. Adopt the Noosa Council 2019-20 Annual Report incorporating the 2019-20 Audited Financial Statements provided as Attachment 1 to this report. B. Authorise the Chief Executive Officer to make any required minor amendments

    Moved by Clare Stewart, seconded by Karen Finzel.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  14. Financial Performance Report – October 2020
  15. That Council note the report by the Manager Financial Services to the General Committee Meeting dated 16 November 2020 outlining October 2020 year to date finan… committee recommendation Budget & finance Carried unanimously

    That Council note the report by the Manager Financial Services to the General Committee Meeting dated 16 November 2020 outlining October 2020 year to date financial performance against budget, including performance against key financial sustainability indicators.

    Moved by Joe Jurisevic, seconded by Amelia Lorentson.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  16. Confidential Session
  17. That the meeting be closed to the public pursuant to section 254J(3)(e) of the Local Government Regulation 2012 for the purpose of discussing legal advice relat… committee resolution Carried unanimously

    That the meeting be closed to the public pursuant to section 254J(3)(e) of the Local Government Regulation 2012 for the purpose of discussing legal advice relating to an appeal in the Planning & Environment Court so that Council’s legal position is protected in relation to Item 3 – Planning & Environment Court Appeal No. D144 of 2019 – Application for Building Works at 54 Seaview Tce, Sunshine Beach.

    Moved by Brian Stockwell, seconded by Tom Wegener.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  18. That the meeting be re-opened to the public. committee resolution Carried unanimously

    That the meeting be re-opened to the public.

    Moved by Joe Jurisevic, seconded by Clare Stewart.

    Carried unanimously. The minutes do not name who voted which way.

    link to this decision

  19. Planning & Environment Court Appeal No. D144 of 2019 - Application for Building Works at 54 Seaview Tce, Sunshine Beach
  20. That Council note the report by the Manager, Development Assessment to the Planning & Environment Committee Meeting dated 10 November 2020 regarding Planning & … committee recommendation Court cases Carried unanimously

    That Council note the report by the Manager, Development Assessment to the Planning & Environment Committee Meeting dated 10 November 2020 regarding Planning & Environment Court Appeal No. D144 of 2019 and agree to settle the appeal generally in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. The applicant must provide a copy of the development approval to the private building certifier who assesses the subsequent development application for a development permit for building works for the construction of the Detached House and the associated deck area and pool. Approved Plans 2. Development must be undertaken strictly under the approved plans listed in the following table unless otherwise amended by these conditions. Drawing No. Revision Drawing Name Date DD 1.1 A Title Sheet 18-12-18 DD 1.2 A Existing Overlay Site Plan 18-12-18 DD 1.3 A Proposed Site Plan 18-12-18 DD 1.4 A Reference Images 18-12-18 DD 1.5 A DA Eaves and Roof Diagram 18-12-18 DD 1.6 A DA Northern Screen Diagram 18-12-18 DD 1.7 A Lower Ground Floor Plan 18-12-18 DD 1.8 A Ground Floor Plan 18-12-18 DD 1.9 A Level 1 Floor Plan 18-12-18 DD 1.10 A Roof Plan 18-12-18 DD 2.1 A North Elevation 18-12-18 DD 2.2 A South Elevation 18-12-18 DD 2.3 A East Elevation 18-12-18 DD 2.4 A West Elevation 18-12-18 DD 2.5 A West Street Elevation 18-12-18 DD 3.1 A Section A 18-12-18 DD 3.2 A Section B 18-12-18 Approved Documents 3. Development must be undertaken strictly under the approved documents listed in the following table unless otherwise amended by these conditions. Document  Tectonic. (2020). “Geotechnical Investigation, 54 Seaview Terrace, Sunshine Beach”, reference 19078-003-Rev 0, dated 17 July 2020.  Joint Expert Report of the Coastal Erosion Experts dated 9 June 2020, including Figure 8-3 of Omtrek (2019). “Working Notes: Brett Mason v Noosa Shire Council – 54 Seaview Terrace, Sunshine Beach”.  Joint Expert Report of the Coastal Erosion Experts dated 14 July 2020. Performance Bond 4. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted to the Council to secure the performance of all conditions of this approval, before the issue of a Development Permit for Building Works by a Private Building Certifier. The cash bond or trading bank guarantee will be returned on the performance of the conditions of approval less any costs incurred by the Council in respect of enforcing the performance of this permit. Council reserves the right to call upon the bond or guaranteed sum in the event that the Appellant defaults in compliance and does not rectify that compliance upon written request of the Respondent which shall provide a reasonable time within which any such default is to be rectified. Building Setback and Height 5. The proposed Detached House must be located on the site, as shown on the Proposed Site Plan, Drawing No. DD1.3, Revision A. The Detached House is not to be located closer than 4.3m to the seaward boundary on the northern side and 5.6m to the seaward boundary on the southern side. The proposed elevated deck on the first level is not to extend closer than 3m to the seaward boundary. Certification of the location of the Detached House, including the elevated open deck from the seaward boundary, is to be provided by a licenced surveyor before the issue of a final classification for the Detached House by the building certifier. The certification must be submitted to Council. 6. The proposed Detached House must not exceed a maximum height of 8m from the natural ground level and finished ground level, as shown on the North Elevation, Drawing No. DD 2.1, Revision A and the South Elevation Drawing No. DD 2.2, Revision A. The height of the Detached House from natural ground level and finished ground level shall be certified by a licenced surveyor before the issue of a final classification for the dwelling by the building certifier. The certification must be submitted to Council. Geotechnical Stability 7. A footing system and erosion protection system must be designed to withstand the short-term erosion associated with a 500-year average recurrence interval storm event combined with shoreline recession due to sea-level rise for 2100 climate change. The short-term erosion associated with a 500-year average recurrence interval storm event combined with shoreline recession due to sea-level rise for 2100 climate change to be considered for the design of stabilisation measures must be that shown on Figure 8-3 of the 2019 Omtrek report “Working Notes: Mason v Noosa Shire Council - 54 Seaview Terrace, Sunshine Beach”, (Reference J0033 R1, 11 May 2019). 8. The footing system and erosion protection system must in accordance with the works detailed in the Tectonic report “Geotechnical Investigation, 54 Seaview Terrace, Sunshine Beach”, (Reference 19078-003-Rev 0, 17 July 2020) and other supporting documents referenced in the Tectonic report. 9. The design must include the protection of the northern and southern boundaries of the site to prevent erosion on neighbouring properties exposing the side boundaries of the site to erosion. The minimum extent of the side boundary protection must be determined by a line drawn at 28° extending upwards to the west from the base of the rear point of the erosion shown on Figure 8-3 of the 2019 Omtrek report “Working Notes: Mason v Noosa Shire Council - 54 Seaview Terrace, Sunshine Beach”, (Reference J0033 R1, 11 May 2019). 10. The design must be accompanied by certification by a Registered Professional Engineer of Queensland (RPEQ) specialising in geotechnical engineering that the design is satisfactory and will provide a long-term factor of safety concerning slope stability of no less than 1.5. 11. Following construction, certification must be supplied to Council by an RPEQ specialising in geotechnical engineering that the works have been constructed under the approved design. 12. A dilapidation survey shall be carried out of all adjacent properties before the demolition of the existing dwelling on the site. 13. Due to the risk of instability on the existing dune slope and the potential for settlement of loose sand on the adjacent properties, vibrations shall be kept to a minimum and shall be monitored during the construction of the Detached House. Driven piles (both sheet piles and pile footings) are not permitted on the site. 14. Landscaping at the rear of the property and the crest of the existing dune slope shall be limited to a maximum surcharge of 5kPa unless a site-specific slope stability analysis is carried out to demonstrate that higher loads are acceptable. 15. Under no circumstances shall building materials be temporarily stockpiled in the area of the crest of the existing dune slope or on the slope. 16. Discharge of concentrated stormwater flows onto the dune slope shall be avoided, and under no circumstances shall subsurface disposal of water be permitted using infiltration pits. 17. Stormwater runoff from gutters, down-pipes, driveways, and paved areas shall be collected and directed by pipes into the Council stormwater system along Seaview Terrace. Where this is not possible, surface water should be directed to infiltrate into the ground around the edges of hard surfaces, with infiltration areas set back as far as possible from the crest of the dune slope. 18. The existing dune slope and any areas disturbed by the construction of the proposed development shall be revegetated as soon as possible to reduce the potential for erosion. Earthworks 19. Earthworks required on-site must be carried out under Council’s Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. Coastal Protection 20. A mix of native endemic coastal vegetation consisting of ground covers, shrubs and trees shall be planted for the width of the property, from the edge of the dwelling to the seaward boundary. The landscaping works is to be consistent with Planning Scheme Policy PSP3 - Landscaping Plants and Guidelines. The planted vegetation must have a minimum pot size of 200mm and must be planted at the following density: a. trees must have a maximum spacing of 5m; b. shrubs must have a maximum spacing of 1.5m; and c. ground covers planted between the trees and shrub stems from providing dense coverage. The development is to provide adequate landscape buffering to protect the character of the beachfront, to the reasonable satisfaction of the Manager Development Assessment. Pedestrian Access 21. A pedestrian access gate must not be installed along the seaward property boundary with direct access by residents to the beachfront area not being permitted. Significant Weather Event 22. Should a significant weather event occur which results in substantial erosion within the site, and undermines the structure and/or renders the Detached House uninhabitable, the owner must 22.1 Immediately secure the perimeter of the property to prevent unauthorised access and then undertake necessary works upon the land to make the detached house safe and suitable for habitation in a timely manner. a. Any work proposed must be designed to ensure that the work will not cause adverse impacts on other lands or on coastal processes. b. Rock, concrete and like hard materials must not be used for the construction of beach protection works. c. Any work proposed to be carried out must undertaken in accordance with a Development Permit for Operational Works. 22.2 or remove the Detached House and all associated structures including the footpath crossover and make the land safe at no cost to the Council.

    Moved by Karen Finzel, seconded by Tom Wegener.

    Carried unanimously. The minutes do not name who voted which way.